Does Your Renovation Need a Building Permit? Roofs, Furnaces, Windows and Basements in Four Canadian Cities

Pick a job and see what the city pages of Toronto, Mississauga, Calgary and Winnipeg say about it, with Calgary's permit fees and what each city asks for a legal basement suite. Read on the cities' own pages on November 19, 2026.

Updated

A building inspector in a hard hat and reflective vest holds a tablet beside the open wall framing of a house in a snowy neighbourhood
$333.84Calgary’s building permit for a basement developed for the first time: $321 plus a $12.84 safety codes fee.
$205.92Calgary’s permit for renovating an existing house or an already developed basement: $198 plus $7.92.
$116.50Calgary’s homeowner plumbing permit, and the same price for the electrical one, if you own the house, live in it and do the work yourself.

Choose the job and read what four city pages say about it

Each card paraphrases the city’s own page, read on November 19, 2026. A grey card means the page did not say, which is not the same as no permit.

All eleven jobs side by side

The same answers as the cards, in one table.

JobTorontoMississaugaCalgaryWinnipeg
Re-roofing with the same materialNo permitNo permitNot on the pageNo permit
Replacing a furnaceNo permitDependsPermitNot on the page
A new window or a bigger window openingPermitPermitPermitPermit
Replacing a window with the same sizeNo permitNo permitNo permitNo permit
Kitchen: cabinets and finishes onlyNo permitNo permitNo permitNo permit
Kitchen or bathroom: adding or moving plumbingPermitPermitPermitDepends
Finishing a basementDependsPermitPermitPermit
A basement apartment or suitePermitPermitPermitPermit
An additionPermitPermitNot on the pagePermit
Underpinning a foundationPermitPermitNot on the pageNot on the page
Waterproofing or damp-proofing a basementNo permitNo permitNot on the pageNot on the page

Legal basement suites: what each city asks for

A suite is the job where a missing permit costs most, because it decides whether you can rent the space and insure it.

Toronto and Winnipeg

Both list a second suite as a permit job. Toronto says the exemption for basement finishing applies only when no additional dwelling unit is created. Winnipeg sends you to a separate secondary suite page, which we could not read, and warns that a development permit may also apply.

Mississauga

A second unit needs a building permit. To register one, the city asks you to email proof of ownership, the signed-off building permit and its registration form. There is no registration fee, and the registry list is updated in the second week of every month.

Calgary

A kitchen and a bathroom make the basement a secondary suite. A wet bar is allowed without a means of cooking, which the city defines as an oven, stove, cooktop or microwave. The city’s suite incentive program stopped taking applications on September 28, 2026.

Who applies, and what a permit does not replace

  • Zoning still applies. Toronto, Mississauga and Winnipeg each say a job that needs no building permit still has to meet the zoning by-law and the building code.
  • Trade permits are separate. Calgary issues electrical and plumbing permits apart from the building permit, and a homeowner cannot change the main electrical service or install solar panels under a homeowner permit.
  • Ask whose name is on the permit. For a contractor job, it should be the contractor’s. Our licence check page shows how to confirm the trade licences behind it.
  • Fees are on other pages. Toronto, Mississauga and Winnipeg send you to separate fee schedules that we did not read, so we show only Calgary’s figures.

Cities we could not read today

The city pages for Ottawa, Edmonton, Vancouver, Saskatoon and Halifax either refused our request or returned an error on November 19, so we say nothing about their rules. Before any job in those cities, open the city’s own permit page or phone its building office.

Lists on city pages are rarely complete, and Toronto says so on its own. Treat a grey card or a close call as a reason to phone the building office before work starts. The pages used are named in where the data comes from.